Projects


Shortlist of projects supported by Albain Group:

BP

Laggan Tormore Pipeline Project, Shetland, UK: Installation of condensate pipeline with pigging facility at Shetland between TOTAL’s Sullom Voe Gas plant (SGP) and BPs operated Sullom Voe Terminal (SVT). Albain Group provided Process Safety PMC support to BP.

BP

Kinneil Liquid Petroleum Gas (KLPG) ChilldownProject, Grangemouth, UK: The project is to replace the current RLPG plant operating with R22 refrigerant with a new plant operating with R410A refrigerant to comply with EU F-Gas regulation. Albain Group provided Process Safety PMC support to BP.

BP

Kinneil Combined Heat and Power Plant (KCHP) Project, Grangemouth, UK: The new gas fired combined heat and power unit will use dry gas to generate all the electricity BP needs to operate the entire Kinneil complex.Albian Group provided Process Safety PMC support to BP.

Canadian Natural

Albain Group personnel are embedded in to the Operations and Project team to provide Technical Safety support to Canadian Natural’s (CNRL) UK and Offshore Africa assets. Canadian Natural is one of the largest independent crude oil and natural gas producers in the world.
  • The Ninian, Lyell and Columba in the Northern North Sea; Banff and Kyle fields produced with Petrojarl Banff floating production storage and offtake vessel (FPSO).
  • The Ninian, Lyell and Columba in the Northern North Sea; Banff and Kyle fields produced with Petrojarl Banff floating production storage and offtake vessel (FPSO).
  • Decommissioning activities Murchison platform.
  • Offshore Africa: The Baobab field tied back to a floating production storage and offtake vessel (FPSO)
  • Offshore Africa -Espoir field: Oil produced is processed, stored and offloaded from the floating production storage and offtake vessel (FPSO) Espoir Ivoirien.
  • Offshore Africa - The Olowi field development in Gabon, West Africa comprises 3 welhead towers and a Conductor Supported Platform all tied back to the Olowi FPSO for fluid processing and export. The FPSO also handles gas compression and Power Generation.
  • South Africa: Block 11B/12B is located in in the Outeniqua Basin, South Africa.

TAQA Bratani Ltd

Cormorant Alpha (COA) Installation
Direct Export Project: The Cormorant Alpha (COA) Installation Direct Export (DE) Project is to provide a hydrocarbon processing solution that will enable continuous export of export specification hydrocarbon from Cormorant Alpha fields; without the reliance on cell group storage. The project will permanently remove reliance on cell group storage to aid hydrocarbon separation. Albain Group provided Technical Safety Engineering support to TAQA for FEED and Detail Design stage of the project.

TAQA Bratani Ltd

Cormorant Alpha (COA) Installation
COA Brent Bypass Project: The purpose of the Brent System Topsides Bypass Project, is to provide a new route for partner’s oil that bypasses the redundant partners metering station and associated route to storage. Albain Group provided Technical Safety Engineering support to TAQA for FEED and Detail Design stage of the project

TAQA Bratani Ltd

Cormorant Alpha (COA) Installation
Booster Compressor Decommissioning Project: The project scope is to isolate, decommission and remove the entire booster compressor and associated pipework and E&I services. Albain Group provided Technical Safety Engineering support to TAQA for FEED and Detail Design stage of the project.

TAQA Bratani Ltd

Eider Installation
Water Injection Subsea Bypass Project: FEED scope on Eider subsea water injection pipeline bypass for Otter to mitigate against integrity concerns with the Otter WI riser. Albain Group provided Technical Safety Engineering support to TAQA for the project.

TAQA Bratani Ltd

North Cormorant Installation
Otter subsea production pipeline bypass to North Cormorant project FEED scope to mitigate against integrity concerns with the Otter riser. Including metering and control ESD system modification. Albain Group provided Technical Safety Engineering support to TAQA for the project.

TAQA Bratani Ltd

Tern Alpha Installation
Water Injection System Modification: Modification of Tern water injection pressure control system to support Otter water injection. Albain Group provided Technical Safety Engineering support to TAQA for the project.

TAQA Bratani Ltd

Otter Subsea Well Complex
Subsea Multi-phase pump installation project including control from North Cormorant Installation. Albain Group provided Technical Safety Engineering support to TAQA for the project.
Albain Group is privileged to have supported the following organisations: